Gaborone, Botswana Dumelang solar calculator +267 310 1006 WhatsApp +267 73 127 514

Project

Oodi, Botswana.

An existing solar home moves from acid batteries to lithium storage, installed in a single day.

Felicity lithium battery and inverter mounted on a wall
Oodi, Botswana · 18 February 2025

About the project

A more efficient way to store the sun.

Location
Oodi, Botswana
Installed
18 February 2025
Project
Installation and configuration
Equipment
Two 5 kW Felicity lithium batteries with a battery management system
Existing system
5 kW solar

The client already had a solar installation with acid batteries and wanted a more efficient storage solution. Solarpro recommended two 5 kW Felicity lithium batteries, added to the existing 5 kW solar system and configured with a battery management system.

The batteries were procured from South Africa and the installation was completed in a single day.

From the client

The recommendation has been very effective so far.Client, Oodi

From the installer

The client was happy with the work and found the technicians knowledgeable. The installation went smoothly and was completed in one day.

Planning something similar?

Tell us about your site and what you want to achieve.

Call WhatsApp Quote