Phase 4, Botswana.

A second off-grid farm in Manyana, powered by solar and battery storage.

Solar installation at the Phase 4 farm
Phase 4, Botswana · 18 April 2025

About the project

Another farm, off the grid.

Location
Manyana, Botswana
Installed
18 April 2025
Customer
Farm owner, four-hectare rural farm
Equipment
Deye inverter and storage, JA Solar panels

The farm is off-grid because extending the national grid was judged too costly and impractical. The farmer needed affordable, reliable power for the farmhouse, a borehole and farm equipment supporting an ongoing agricultural project.

After an on-site assessment, Solarpro proposed a scalable system using Deye equipment with battery backup.

From the client

The system is working well so far, and the monitoring app is useful.Farm owner, Manyana

From the installer

The installation was completed successfully with no issues to date, and regular check-ins continue. Supplier delays on specialised components were handled professionally.